Deploy Automated Shuttle Systems with Initial Low Operating Speeds for a Smoother Transition into Mixed Vehicle Environments.

Start with a low operating speed for smoother deployment of automated shuttle systems in mixed automated and traditional vehicle environments. This project demonstrated that a maximum speed of 18 km…
Content type
Date Posted
11/20/2023

Disseminate Notifications of Emergency Alerts and Travel Bans via Mass Text Messaging to Reach Residents, per Lessons Learned from the December 2022 Buffalo Blizzard.

Enhance the enrollment of wireless emergency alert systems and install physical signage in public locations to ensure emergency notifications reach the majority of residents. Alerts on travel…
Content type
Date Posted
11/20/2023
Taxonomy (ARC-IT) Early Warning System (PS11)

Signal Priority Tested on Connected School Buses in Fulton County Resulted in a 40.4 Percent Decrease in Number of Stops and 13.3 Percent Reduction in Travel Time.

METHODOLOGY The study collected data in 2022 for a month prior to deployment of the technology, and then another month while the CV technology was implemented. Data for the analysis was collected…
Content type
Date Posted
11/17/2023
Taxonomy (ARC-IT) Transit Signal Priority (PT09)

Connected Vehicle Technology Was Deployed on School Buses and at Intersections in Georgia For Approximately $5,000 per Bus and $5,000 per Intersection.

Traffic signal priority (TSP) granted by communications between connected vehicles and the infrastructure has the potential to increase the mobility and efficiency of designated vehicles. Connected…
Content type
Made Public Date
11/17/2023
Taxonomy (ARC-IT) Transit Signal Priority (PT09)

The Estimated Cost for Building Ten Electric Charging Stations for Tenant Shippers at the Port of Oakland Ranged From $1.25M to $2M.

The Port of Oakland Board of Port Commissioners approved the Seaport Air Quality 2020 and Beyond Plan in 2019 which establishes zero-emission operations as the policy direction of the Seaport. Among…
Content type
Made Public Date
10/31/2023

Anticipate Potential Additional Deployment Time Required for Registering On-Board Units with the Security Credential Management System for Cybersecurity.

Anticipate potential additional deployment time required for registering on-board units (OBU) with the SCMS for cybersecurity. While the SCMS offers a secure and privacy-preserving method for V2X…
Content type
Date Posted
10/30/2023

An Active Safety-Collision Warning Pilot in Washington State Estimated a Potential Upper Bound of Annual Total Net Benefits Between $1.1M and $2.1M Due to Prevention of Collisions with Vehicles, Pedestrians, and Bicyclists.

METHODOLOGY The first phase of this project involved equipping 38 transit buses with the CAWS. The buses traveled 352,129 miles during 23,798 operating hours from April 1, 2016 to June 30, 2016.…
Content type
Date Posted
10/30/2023

Showcase Vehicle and Station Prototype Technology To Help Agencies and Communities Better Envision Planned Bus Rapid Transit (BRT) Systems.

Recommendations and best practices for BRT planning and implementation: Conduct targeted outreach to business owners along the planned BRT corridor prior to any construction work. Peers have…
Content type
Date Posted
10/30/2023

Consider Both Cost and Productivity When Evaluating the Financial Viability of Bus Rapid Transit Systems.

Recommendations and best practices for BRT planning and project delivery: Regularly update and assess a comprehensive risk register to ensure project stability. It was suggested in this study to…
Content type
Date Posted
10/30/2023