Adaptive signal control systems installed on two corridors in Colorado improved weekday travel times 6 to 9 percent.
METHODOLOGYBefore and after data were collected to evaluate performance. Data collected prior to installation represented corridor performance using coordinated signal control operations with timing…
Content type
Date Posted
08/29/2014
Geolocation links