The City of Tyler, Texas deployed Adaptive Control System (ACS)-Lite on a 3.17-mile corridor at a cost of $546,900.
Content references source material no longer available at its original location.
In November 2007, the City of Tyler deployed the Adaptive Control System (ACS)-Lite technology along a 3.17-mile corridor. The deployment included the following costs: $150,600 for the software…
Content type
Made Public Date
10/16/2008
Geolocation links