Estimated Cost for Implementing Max-Pressure Adaptive Signal Control on 3,280 Intersections in the Twin Cities Metro Area in Minnesota was $69,961,900.
To implement the max-pressure signal timing technology, additional loop detectors would be needed to determine queue lengths at the signalized intersections. In addition to loop detectors, another…
Content type
Made Public Date
07/25/2023
Taxonomy (ARC-IT)
Traffic Signal Control (TM03)
Geolocation links