Travel-time Optimization on I-285 with Improved Variable Speed Limit Algorithms and Coordination with Ramp Metering Operations 02/01/2019
Alternative Designs to Alleviate Freeway Bottlenecks at Merging, Diverging, and Weaving Areas 05/01/2020
Planning Level Evaluation of the Effects of Ramp Metering on North Carolina Freeways Final Report 02/01/2019
Implementation of a Variable Speed Limit/Ramp Metering Strategy to Increase Freeway Capacity at Metered On-Ramps 10/01/2020
Coordination of Freeway Ramp Meters and Arterial Traffic Signals Phase II-B - Field Implementation 02/01/2021
Investigating the Feasibility of Coordinated Ramp Metering Along Freeway Corridors in Ohio 12/01/2018