Maintain loop detection health close to 100 percent and data quality above 90 percent in order to operate CRRM. The operation of Local Responsive Ramp Metering (LRRM) (during peak hours) should be…
Red-light running is a significant safety problem in the United States, resulting in approximately 95,000 crashes and 1,000 fatalities annually. One ITS treatment option is to install red-light…
This research project that was conducted to define and evaluate infrastructure-only Intersection Collision Avoidance System (ICAS) concepts, produced a number of important findings and lessons…
The institutional scope of the CTS project is large and complex, encompassing public and private stakeholders and government entities from one city and two counties in two States. The project…
The CTS project was the first deployment of transit ITS technologies in the Lake Tahoe region and involved a number of different technologies including, Computer-Aided Dispatch (CAD), Mobile Data…
The Consolidated Transit System blended fixed route, flex-route, and demand-response operations into one system in order to provide a fully integrated system to maximize cost and operating efficiency…
As part of the CTS, kiosks were placed at key locations in the South Shore region of Lake Tahoe to support trip scheduling and dispatch services, provide transit and traveler information (e.g.,…
The CTS Board maintained a close relationship with Area Transit Management (ATM), the operator of transit services for CTS. Overall, this relationship was critical to the success of the project. In…
As part of the evaluation of the Lake Tahoe Coordinated Transit System, interviews were conducted among the stakeholders. A key topic discussed in all the interviews was funding, including both…
ADMS offer numerous potential benefits, including the ability to better evaluate system performance, plan for operations, and support future investment decisions. Washington State TRAC, for example,…
Communications and interoperability between agencies becomes much easier if all the agencies in one state have the same system or equipment. This permits information to flow between those agencies in…
A key requirement for many rural transit agencies is reducing the time it takes to schedule trips and streamline the process of planning trips. Manual scheduling and planning of trips requires a…
Because of limited funding, rural transit agencies are not using new technology to the extent that their larger urban counterparts are; in fact, very few rural transit agencies have plans to…
In the deregulated telecommunications environment, agencies have a much wider and more varied choice for telecommunications services. There are many firms, each offering different services, prices…
Procurement of either owned or leased telecommunications services is a critical part of an ITS implementation, as the telecommunications system enables the ITS infrastructure to operate in an…
An effective needs assessment is important to selecting an appropriate telecommunications solution for an ITS deployment. In addition to a requirements analysis, a needs assessment also includes the…
Weather events have both major and minor impacts on transportation management operations. During seasonal weather events, these impacts may include reduced traffic flow or increased traffic incidents…
In addition to highlighting current best practices for emergency integration and ways to improve current levels of integration, this study recommends investment in the development of new methods and…
Transportation Management Centers are established around the country to integrate data, information, and systems in support of day-to-day traffic and emergency operations. Incomplete or inaccessible…
ITS projects should ensure that the procurement processes available for both standardized "commodity" type equipment and highly complex integrated ITS components are adequate and thorough. Complex…
Stakeholder policies, priorities, and personnel training are critical to the success of the project to reduce delays and ensure consistency in each agency's deployment schedule. Reaching consensus on…
ITS systems should have safeguards in place to monitor and protect the fiber-optic cabling and components after installation and to notify system personnel of damage. By including adequate safeguards…
Minimize the risk and cost of ITS deployments by deploying ITS using the framework provided by the National ITS Architecture. The National ITS Architecture accommodates multiple designs using diverse…
Methodology
Several sites experiencing freeway merge / diverge deficiencies and speed-change areas resulting in capacity reduction were selected for analysis of these control strategies, including:
I…
METHODOLOGY
The proposed approach in this study requires that the merging vehicle negotiates the creation of a safety gap in the destination lane. Until the lane change maneuver is completed, the…
METHODOLOGY
A microscopic traffic simulation evaluation was conducted using PTV VISSIM with realistic traffic flow and signal timing data collected during 7:00-8:00 AM on Thursday, June2, 2016 for…
Methodology
Quota sampling was used to ensure a sample that closely represented the California population of adults 55 years of age and older in terms of basic socio-demographic characteristics. The…
Content references source material no longer available at its original location.
FINDINGS
Although toll agencies were initially expected to incur additional costs to purchase 6C transponders and related equipment, retrofit ETC systems, and dispose of old equipment, these costs…
Content references source material no longer available at its original location.
In California, regulatory changes in 2016 supported a transition from the Title 21 (T21) hard-cased electronic toll collection (ETC) protocol commonly used across the United States, to a newer and…
At the request of the California Department of Transportation (Caltrans) and Bay Area Rapid Transit (BART), the California Partners for Advanced Transit and Highways (PATH) researchers conducted a…
Content references source material no longer available at its original location.
As part of an evaluation of automated truck rollover warning systems, PennDOT researched curve speed warning systems in several other states. The evaluation data highlighted in this presentation…
The HAZMAT Safety & Security Field Operational Test was conducted to assess commercially available, off-the-shelf technology that could be readily deployed in the near term to enhance the safety…