Content that references this location

Coordinated Ramp Metering Systems Implemented in California Showed a Delay Reduction of Up to 9 Percent and Travel Time Reliability Improvement of Up to 28 Percent During Peak Periods.

Methodology In the “before” period (September-October 2016) the I-80 corridor did not utilize ramp metering. The “after” (September-November 2018) ramp metering system was a CRM algorithm based on…
Content type
Date Posted
10/25/2022
Taxonomy (ARC-IT) Traffic Metering (TM05)

An Integrated Dynamic Transit Operation System for Suburban Transit Decreased Connecting Passengers’ Average Waiting Time by 24 to 31 Minutes.

Methodology A field operational test of the IDTO prototype was conducted from July 25th to August 11th, 2017, focusing on the T-CONNECT application on selected TDT routes and at key connection points…
Content type
Date Posted
12/28/2021

Upgrade Transit Management System with Driver Information Terminals to More Efficiently Meet Operational Needs with an Integrated Dynamic Transit Operation System.

Improve dynamic transit applications by using a combination of innovative real-time data capture and data management methodologies. Innovative technologies, such as stand-alone mobile applications…
Content type
Date Posted
12/28/2021