A Managed Lane Toll System’s Planned Expansion in Minnesota Was Estimated to Save Users More Than $14M Annually in Total Costs, Including Reduced Travel Time, Crashes, and Vehicle Operation.

METHODOLOGY This study used demographics and traffic data from existing E-ZPass and managed lanes facilities in the study area to perform the equity analysis for the planned expansion of the existing…
Content type
Date Posted
12/26/2023
Taxonomy (ARC-IT) Road Use Charging (TM11)

Cost-Benefit Analysis of Fuel-Efficient Speed Control Using Signal Phasing and Timing (SPaT) Data in Minnesota Revealed Increased Fuel Benefits by Three to 13 Percent.

METHODOLOGY In this study, several test vehicles were instrumented with On-Board Units (OBU) of Dedicated Short-Range Communications (DSRC) receivers and GPS tracking to record SPaT data and the…
Content type
Date Posted
07/26/2023
Taxonomy (ARC-IT) Connected Eco-Driving (ST09)

Regional Truck Parking Information and Management Systems have a benefit-to-cost ratio of 4.27.

A benefit-to-cost estimated for the MAASTO TPIMS estimated as part of the 2015 TIGER Grant application using the TIGER BCA Resource Guide was based on project performance data collected from the…
Content type
Date Posted
01/30/2019

Conduct Yearly Solar Panel Maintenance Including Surface Cleaning and Charging Output Tests When Using Solar Powered Intelligent Warning Devices

Conduct yearly solar panel reviews including surface cleaning and charging output tests when using any solar powered systems. While these systems often use maintenance-free batteries, it is…
Content type
Date Posted
01/31/2024