Effectiveness of Changeable Message Signs in Controlling Vehicle Speeds in Work Zones: Final Report 08/02/1994
Effectiveness of Changeable Message Signs in Controlling Vehicle Speeds in Work Zones: Phase II - Final Report 12/02/1998
Intelligent Transportation Systems in Work Zones: A Case Study - Real Time Work Zone Traffic Control System 10/02/2004
Benefits Analysis for the Georgia Department of Transportation NaviGAtor Program: Final Report 08/02/2006
Performance Evaluation of CHART (Coordinated Highways Action Response Team) Year 2002 (Final Report) 11/02/2003
Hazardous Materials Safety and Security Technology Field Operational Test Volume II: Evaluation Final Report Synthesis 11/12/2004