Ramp metering, deployed by installing traffic signals on the on-ramp of a freeway, is a freeway active traffic management (ATM) strategy that is often used to control the frequency of traffic onto…
Methodology
The planning‐level evaluation focused on four major steps:
planning‐level data collection
planning level analysis
life cycle cost analysis
before‐and after installation evaluation
Key…
Arterial signal timing should be considered for optimal results. Signals surrounding the on‐ramp signals should use time of day plans that are re‐evaluated and re‐timed as needed every three to six…