A simulation analysis shows that a 30 percent connected vehicle (CV) penetration rate can reduce total delay up to 60 percent during a no-notice evacuation event.

Findings Scenarios with a CV penetration rate of 30 percent were associated with a 60 percent reduction in total delay, despite an initial increase in delay. Scenarios with a longer duration were…
Content type
Date Posted
03/26/2018

Illinois DOT implements work zone ITS on the I-64 Add-lane Construction project at a cost of $435,000.

Content references source material no longer available at its original location.
The Federal Highway Administration (FHWA) partnered with the American Association of State Highway and Transportation Officials (AASHTO) to encourage the implementation of work zone ITS through an…