Transit Signal Progression Algorithm for Supporting Redwood Road Transit Signal Priority (TSP)

The Connected Vehicle (CV) corridor, built along an 11-mile long road with 30 signalized intersections in Salt Lake County, Utah in 2017, utilizing Dedicated Short-Range Communication (DSRC) techno

Content type
Source
Source Publication Date
10/01/2020
Author
Wang, Qinzheng; Xianfeng Terry Yang; and Yun Yuan
Publisher
Prepared by University of Utah for Utah DOT
Other Reference Number
Report No. UT-20.16