MethodologyA previously calibrated VISSIM microsimulation model of an 8.5-mile segment of US-101 freeway in San Mateo, California was used for a "before and after" analysis. Modeling was done for six…
Evaluation Approach
For the simulation, 24 scenarios were modeled utilizing various operational conditions: two incident conditions (short, long), two weather conditions (dry, rainy) and 6 levels of…