In Oakland County, Michigan a two-phase project to retime 640 traffic signals resulted in a benefit-cost ratio of 175:1 for the first phase and 55:1 for the second.

FINDINGS In Oakland County, Michigan a two-phase project to retimed 640 traffic signals resulted in a benefit-cost ratio of 175:1 for the first phase and 55:1 for the second.
Content type
Date Posted
01/19/2007

In Oakland County, Michigan retiming 640 traffic signals during a two-phase project resulted in Carbon monoxide reductions of 1.7 and 2.5 percent, Nitrogen oxide reductions of 1.9 and 3.5 percent, and hydrocarbon reductions of 2.7 and 4.2 percent.

FINDINGSThe benefits of improved signal timing have been demonstrated in Oakland County, Michigan and Syracuse, New York. In Oakland County, Michigan, retiming 640 traffic signals during a two-phase…
Content type
Date Posted
01/19/2007

Across the nation, traffic signal retiming programs have resulted in travel time and delay reductions of 5 to 20 percent, and fuel savings of 10 to 15 percent.

FINDINGSAcross the nation, traffic signal retiming programs have resulted in travel time and delay reductions of 5 to 20 percent and fuel savings of 10 to 15 percent. In Syracuse, New York, benefits…