Content that references this location

A pedestrian safety system was deployed in downtown Boulder, Colorado; total project cost ranged from $8,000 to $16,000.

A busy intersection with high-volume pedestrian traffic in downtown Boulder, Colorado, was equipped with an illuminated crosswalk. The illuminated crosswalk covers 4 lanes and consists of a series of…
Content type
Made Public Date
09/30/2003