Hyperlink Exit Door
Yes
Last Modified Date
Lesson Background HTML
The goal of the Signal Phase and Timing (SPaT) Challenge program is to challenge state and local public sector transportation infrastructure owners and operators (IOOs) to deploy DSRC infrastructure with SPaT (and MAP) broadcasts in at least one corridor or network (approximately 20 signalized intersections) in each state by January 2020. Updates on project planning, procurement, installation, testing, and operations are periodically posted on the NOCoE website with cooperation from the American Association of State Highway and Transportation Officials (AASHTO), the Institute of Transportation Engineers (ITE), and the Intelligent Transportation Society of America (ITSA) and the Federal Highway Administration (FHWA).

SPaT Challenge Webinar Series Webinar #10 included updates from Jianming Ma and Steve Chiu (Texas DOT), Cameron Mott (Southwest Research Institute), and Mike Mollenhauer (Virginia Tech Transportation Institute).
Pages
76
Publication Sort Date
Publisher
National Operations Center of Excellence (NOCoE)
Result Type
Source ID
1985
Title
SPaT Challenge Webinar #10: Operational SPaT Deployments
UNID
AA7E70006CAA960F852583D200598A84
Source Review
External URL Disclaimer

(Our website has many links to other organizations. While we offer these electronic linkages for your convenience in accessing transportation-related information, please be aware that when you exit our website, the privacy and accessibility policies stated on our website may not be the same as that on other websites.)