Hyperlink Exit Door
No
Last Modified Date
Lesson Background HTML
The Electric Vehicle Charing in the Right-of-Way (EVCROW) pilot was launched by the Seattle Department of Transportation in partnership with the Office of Sustainability and Environment and Seattle City Light in July 2017 and concluded in December 2019. Seattle has a goal of 30 percent of vehicles being electric by 2030. Most owners of electric vehicles charge their vehicles at night in a garage or driveway. Since most Seattle residents are renters and may not have access to private parking, EVCROW was proposed to alleviate a barrier of entry for further EV adoption in the city.  

The pilot was deployed to assess the considerations and challenges around permitting, installation, usage behavior, and equity of installing stations in the ROW. While 68 applications were submitted for installation, several barriers limited approval to one location (two charging stations) within the 18-month pilot period.
Publication Sort Date
Publisher
Seattle DOT
Result Type
Source ID
2082
Title
Electric Vehicle Charging in the Right-of-Way Permit Pilot (EVCROW): 1.0 Evaluation Report
UNID
A7F581846236C093852584F8004E304C
Source Review
External URL Disclaimer

(Our website has many links to other organizations. While we offer these electronic linkages for your convenience in accessing transportation-related information, please be aware that when you exit our website, the privacy and accessibility policies stated on our website may not be the same as that on other websites.)