The New I-64 Economic and Regional Mobility Study: Final Report

In 2008 and 2009, large portions of the I-64 corridor west of St. Louis, Missouri were closed for construction in two separate phases that allowed for an accelerated construction timeline.

Content type
Source
Source Publication Date
11/01/2011
Author
Dr. Lance Gentry, M.B.A. Ph.D. Dr. Venkata Chilukuri, Ph. D. Thomas Hiles, EI Michael Trueblood, P.E., P.T.O.E. Christopher Kinzel, P.E. Robert Frazier, PE, AICP Dr. Ghulam Bham, Ph.D. Jonathan Lee Daniel Hodge Marissa Witkowski Tom Ryan, P.E.