Sample Unit Cost Database
Sample unit cost consist of cost entries for ITS components that have been compiled from available sources, typically bid tabulation data from state DOTs. Costs are presented in the original year of expenditure and in inflation or index-adjusted dollars. For more information on Sample Unit Costs, see the Costs FAQ page.
Filters above this line apply immediately upon selection. Filters below require pressing 'Apply'.
Displaying 71 - 80 of 6348
| Identifier | Cost Subsystem | Unit Cost Element | Unit Cost Component | Description | Capital Cost Per Unit | OM Cost Per Unit | Adjusted Capital Cost Per Unit | Adjusted O&M Cost Per Unit | Reported Units | Lifetime | Location | Unit Cost Type | Unit | CPI ID | CPI Name | Year | Source | Associated System Cost |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| UC2012-02192 | Transit Management Center (TR) | Transit Center Software, Integration | AVL system software integrated with scheduling | AVL route and schedule adherence (RSA) software at transit management… |
$160,000.00 | $16,000.00 | 177000 | 17700 | 1 | United States | Estimated | System | 3 | PCU511210511210502 | Characteristics of Bus Rapid Transit for Decision-Making (CBRT) 2009… |
|
||
| UC2012-02193 | Transit Management Center (TR) | Transit Center Software, Integration | AVL system software integrated with scheduling | AVL route and schedule adherence (RSA) software at transit management… |
$230,000.00 | $23,000.00 | 254000 | 25400 | 1 | United States | Estimated | System | 3 | PCU511210511210502 | Characteristics of Bus Rapid Transit for Decision-Making (CBRT) 2009… |
|
||
| UC2012-02318 | Archived Data Management Subsystem (ADMS) | Backup Server - Data Archiving (High) | 10 TB backup server for a regional data archiving system, high estimate… |
$8,800.00 | 5990 | 2 | Chicago, Illinois, United States | Estimated | Each (EA) | 5 | WPU115 | Regional Data Archiving And Management For Northeast Illinois |
|
|||||
| UC2012-02317 | Archived Data Management Subsystem (ADMS) | Backup Server - Data Archiving (Low) | 10 TB backup server for a regional data archiving system, low estimate… |
$8,600.00 | 5860 | 2 | Chicago, Illinois, United States | Estimated | Each (EA) | 5 | WPU115 | Regional Data Archiving And Management For Northeast Illinois |
|
|||||
| UC2010-00891 | Transit Management Center (TR) | Basic Facilities, Comm. for Large Area - TR | Basic Facilities for Large Area | Transit management facility. Based on purchase of building rather than… |
$300,000.00 | 453000 | 20 | Tampa, Florida, United States | Estimated | Lump Sum (LS) | 4 | NDU BBLD-BBLD | ITS Integration Program Unit Cost Data Collection Sheet: Tracking,… | |||||
| UC2010-00953 | Transportation Management Center (TM) | Basic Facilities, Comm. for Small Area - TM | Basic Facilities, Comm for Small Area | Basic facilities, communications for small area |
$195,000.00 | $1,000.00 | 316000 | 1620 | 10 | Hattiesburg, Mississippi, United States | Actual | Lump Sum (LS) | 4 | NDU BBLD-BBLD | ITS Integration Program Unit Cost Data Collection Sheet: STP-6098-00(… | |||
| UC2010-00989 | Transportation Management Center (TM) | Basic Facilities, Comm. for Small Area - TM | Basic Facilities, Comm for Small Area | Basic facilities, comm. for small area. |
$136,000.00 | $10,000.00 | 220000 | 16200 | 10 | Lynnwood, Washington, United States | Actual | Lump Sum (LS) | 4 | NDU BBLD-BBLD | ITS Integration Program Unit Cost Data Collection Sheet: Lynnwood ITS… | |||
| UC2010-00994 | Personal Devices (PD) | Basic PDA | Basic PDA | Basic PDA |
$200.00 | $10.00 | 153 | 7.66 | 3 | Lynnwood, Washington, United States | Actual | Each (EA) | 2 | WPU1178 | ITS Integration Program Unit Cost Data Collection Sheet: Lynnwood ITS… | |||
| UC2010-00308 | Personal Devices (PD) | Basic PDA | Basic PDA | PDA with build in wi-fi (used to upload traffic signal database to… |
$500.00 | 413 | 5 | Boise, Idaho, United States | Unknown | Each (EA) | 2 | WPU1178 | ITS Integration Program Unit Cost Data Collection Sheet: Treasure… | |||||
| UC2019-05404 | Transit Vehicle On-Board (TV) | Other Unit Cost Elements | Battery-electric bus | Hometown coach shuttle bus – Qualified Vehicle Modifier (QVM) certified… |
$400,000.00 | 416000 | 1 | San Francisco, California, United States | Estimated | Per Vehicle | 2 | WPU1178 | PresidiGo Capital Plan: A Technical Analysis of Alternative Transit… |
