An analysis of the I-90 ramp closure system in Minnesota found benefit-cost ratios ranging from 0.13:1 to 3:1 with varying estimates of crash and delay reductions.
Minnesota, United States
Documentation and Assessment of Mn/DOT Gate Operations
Summary Information
In Fall 1998 and between March and August 1999, Mn/DOT's Office of Advanced Transportation Systems conducted analyses to document past procedures and to identify current operational issues associated with gate systems. A benefit-to-cost analysis compared potential savings to estimated costs, and a winter storm case study compared costs for clearing a gated highway section to costs for clearing a section without gates.
FINDINGS
The benefit-to-cost analysis focused on costs of the Interstate 90 gate system and associated benefits due to delay and accident reductions. The annual frequency of snow/ice related accidents and hourly volume data were used in the analysis. Total system costs were calculated assuming deployment costs of 159,700 dollars plus five percent operations and maintenance costs over 10 years. The potential range of benefits and benefit-to-cost ratios are shown in Table 1.
Table 1: Range of Interstate 90 Gate System Benefits/Costs
| Potential Range of Benefits over 10 Years | Benefit-to-Cost Ratio |
|---|---|
| 10% Reduction in Delay (Low Volume) + 0% Accident Reduction = $28,096 | 0.13 |
| 20% Reduction in Delay (High Volume) + 1% Accident Reduction = $168,981 | 0.76 |
| 20% Reduction in Delay (High Volume) + 2% Accident Reduction = $217,636 | 0.98 |
| 30% Reduction in Delay (Low Volume) + 3% Accident Reduction = $230,253 | 1.04 |
| 40% Reduction in Delay (High Volume) + 0% Accident Reduction = $240,651 | 1.09 |
| 40% Reduction in Delay (Low Volume) + 3% Accident Reduction = $258,350 | 1.17 |
| 20% Reduction in Delay (High Volume) + 3% Accident Reduction = $266,290 | 1.20 |
| 50% Reduction in Delay (Low Volume) + 4% Accident Reduction = $335,101 | 1.51 |
| 40% Reduction in Delay (High Volume) + 4% Accident Reduction = $435,270 | 1.97 |
| 70% Reduction in Delay (High Volume) + 5% Accident Reduction = $664,414 | 3.00 |