An Assessment of the Potential of ATIS to Reduce Travel Disutility in the Washington DC Region 01/13/2003
Using Simulation to Estimate Speed Improvements from Simple Ramp Metering at On-Ramp Junctions 01/14/2002
Transit Signal Priority on a Fully-Actuated Signalized Corridor Utilizing Advanced Priority Logic and Detection Systems 10/15/2002