Description
Design Phase- System and Software Architecture Description - System Requirements Specification - Interface and Database Design Definition- Hardware and Network Architecture - System Test Plan
Made Public Date
Match to Unit Cost Element
false
Notes
Unit cost data came from conversation with Rob Alexander of VDOT on April 6, 2006 - Source did not include Unit costs.
Part Of Unit Cost Element Architecture
false
UNID
E375A7971B17D7F8852576CF0010B4C0
Unit
Lump Sum (LS)
Cost Type
Capital Cost Per Unit
50000.00
Geo