Description
Automated Work Zone Information System (AWIS) acquires traffic data throughout the work zone and display predetermined information to motorists automatically without operator intervention after system initialization. Lump Sum price includes furnishing, installing, operating, and maintaining the AWIS during interchange modification and overcrossing widening project with duration of 750 work days.
Made Public Date
Match to Unit Cost Element
false
Notes
Bidder 4
Part Of Unit Cost Element Architecture
false
UNID
A9D1F3F5215D14F7852581F50073AA62
Unit
Lump Sum (LS)
Cost Type
Reported Units
1
Capital Cost Per Unit
90000.00
Geo