BCD ALL year
Benefit Summary HTML

The Metro Rapid Demonstration Program was initiated in March 1999 by the Los Angeles County Metropolitan Transit Authority's (MTA's) Board of Directors following an initial feasibility study. The feasibility study recommended that MTA, in partnership with the City of Los Angeles conduct a Bus Rapid Transit (BRT) demonstration along a couple of corridors that have strong ridership and unique characteristics to determine if it would be feasible to deploy a full-scale BRT program within the MTA system. The two transit lines chosen for the demonstration were

  • Line 720 Wilshire/Whittier
  • Line 750 Ventura
Hyperlink Exit Door
Yes
Last Modified Date
Publication Sort Date
Publisher
U.S. DOT Federal Transit Administration
Source ID
770
Title
Metro Rapid Demonstration Program Evaluation Report
UNID
83C0A03A4C93AAAA8525737500464604
Source Review
External URL Disclaimer

(Our website has many links to other organizations. While we offer these electronic linkages for your convenience in accessing transportation-related information, please be aware that when you exit our website, the privacy and accessibility policies stated on our website may not be the same as that on other websites.)