Description
One over-sized junction box. Cost also includes one delineator marker at $75.00 each.
Made Public Date
Match to Unit Cost Element
false
Notes
Plan included one box installed every 2,000 ft. Costs figures derived from 2006 NC DOT bid averages.
Part Of Unit Cost Element Architecture
false
UNID
624F48835A4DCAF28525792D0058721D
Unit
EA
Unit Cost Component
Cost Type
Capital Cost Per Unit
650.00
Geo