Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 1A. TH 36: I-35W to I-35E.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $7 million to $12 million per mile (includes ATM and non-ITS infrastructure). ATM component: $6 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
8F38226046C3509B85257981005D73CC
Unit
Per Mile
Cost Type
Reported Units
5 miles
Capital Cost Per Unit
9500000.00
OM Cost Per Unit
50000.00
Geo