Description
Fiber Optic Cable (Single Mode) (12 Fiber)
Made Public Date
Match to Unit Cost Element
false
Notes
This is an CDOT engineer's cost estimate of a project consist of Weather Station (WS) upgrades in Region 2 and Region 3 (Las Animas, Huerfano, El Paso, Park, Mesa, Pitkin, and Garfield Counties), work consisted of installation of new WSs, Fold-Over Towers, foundations, light standards and foundations, cellular modems, an ethernet switch, fiber, pull boxes, bored and trenched conduit, and the reset of existing communications equipment.
Part Of Unit Cost Element Architecture
false
UNID
0FB0DC22FACF3761852582CD006A9D4D
Unit
Per Mile
Unit Cost Component
Cost Type
Reported Units
0.71
Capital Cost Per Unit
31680.00
Geo