City Minneapolist, St. Paul State Minnesota Country United States Geo Type Region Latitude 45.25 Longitude -93.46
The costs of the Integrated Corridor Management Project (ICTM), deployed on an 8-mile section of the I-494 transportation corridor south of the Twin Cities in Minnesota, was $9 million. The Integrated Corridor Management Project (ICTM) deployed ITS applications along an 8-mile corridor crossing through five jurisdictions, that encompassed I-494, four parallel arterial streets, and… Content type System Cost Made Public Date 06/29/2010 Taxonomy (ARC-IT) Traffic Information Dissemination (TM06), Integrated Decision Support and Demand Management (TM09), Infrastructure-Based Traffic Surveillance (TM01), Traffic Signal Control (TM03), Emissions Monitoring (ST01), Eco-Traffic Metering (ST03), Traffic Metering (TM05) Geolocation links Minneapolist, St. Paul, Minnesota, United States