Displaying 1 - 10 of 1612

These filters apply immediately upon selection.
These filters require pressing "Search" to apply.

Lab-Test Results Showed that Vision-Based Red Light Violation Warning Application Combined with Assured Green Period Could Reduce Red-Light Running by 93 Percent.

METHODOLOGY The test plan for three applications considered two RSE configurations: one using FHWA's open source V2X Hub middleware, the other relying on built-in RSE features. Two data capture…
Content type
Date Posted
04/25/2024

Dynamic Speed Feedback Signs (DSFS) Can Lower Ramp Curve Entry Speeds by 4.5 mi/h Reducing Risk of Lane Departures When Installed 250 ft to 400 ft Upstream of Freeway Interchange Exit Ramps.

METHODOLOGY This study examined three commercially available DSFS signs at six different freeway interchange ramps in Michigan. The evaluation tested several aspects of the DSFS, including physical…
Content type
Date Posted
04/24/2024

A Variable Speed Limit (VSL) System Using an AI-Based Algorithm on I-24 in Nashville Reduced Traffic Speed Variations by 32.7 Percent to Improve Safety with Limited Impacts on Vehicle Hours of Delay (VHD).

METHODOLOGY Researchers obtained data from commonly available Radar Detection Systems (RDS) on highways to shape the state input of each VSL controller unit. Regarding the action space of the agents…
Content type
Date Posted
04/23/2024
Taxonomy (ARC-IT) Variable Speed Limits (TM20)

Adopt Different Machine Learning (ML) Models to Predict Congestion Measures for Rural and Urban Areas Based on Modeling Performance Differences and Utilize Explainable ML for Enhanced Interpretation.

Adopt different ML models to predict congestion measures for rural and urban areas based on the performance differences. This study found better performance of rural freeway models as compared to…
Content type
Date Posted
03/22/2024

Coordinate Long-Term Planning Schedules and Goals to Enhance Data Exchange and Collaborative Efforts Among Multiple Metropolitan Planning Organizations (MPOs).

Coordinate long-term planning schedules and goals to enhance collaborative efforts. Beginning with manageable projects and tracking their progress and results in a transparent fashion helps…
Content type
Date Posted
02/29/2024

Conduct Durability Tests to Ensure Antenna Mounting Supports Proper Connected Vehicle Communications for Large Vehicles.

Conduct interoperability test to identify potential issues that would require resolution prior to the sites advancing to an operational phase. The three-day testing event was a major victory for the…
Content type
Date Posted
02/29/2024

Conduct Yearly Solar Panel Maintenance Including Surface Cleaning and Charging Output Tests When Using Solar Powered Intelligent Warning Devices

Conduct yearly solar panel reviews including surface cleaning and charging output tests when using any solar powered systems. While these systems often use maintenance-free batteries, it is…
Content type
Date Posted
01/31/2024