A Planning Model for a Partially Grid-Connected Bus Rapid Transit System Equipped With In-Motion Charging Was Estimated To Save Energy Equivalent to Moving Two Tons of Rolling Stock a Distance of 155 Miles per Day. METHODOLOGY In this study, the BEB considered was instrumented with a recording system, and operational data were collected on weekdays during its actual operation. Additionally, several performance… Content type Benefit Date Posted 12/22/2023 Taxonomy (ARC-IT) Electric Charging Stations Management (ST05) Geolocation links Medellin, Columbia