Content that references this location

Fixed automated spray technology systems for bridges in North Dakota produce 1.3 to 4.3 benefit-cost ratio over their twenty year lifecycle.

FindingsBuxton Bridge FAST systemDue to the reduction in crashes attributed to the installation of the FAST system on Buxton Bridge, there is an annual safety benefit of $78,738. Reduced maintenance…
Content type
Date Posted
05/09/2013

Total crashes were reduced by 50-66 percent on bridge decks in North Dakota utilizing fixed automated spray technologies for anti-icing.

MethodData for twelve winter seasons from January 1, 1996 through May 31, 2008 were collected from NDDOT and Mn/DOT in order to analyze the effectiveness of the FAST systems. Crashes occurring…
Content type
Date Posted
05/09/2013