A Feasibility Study in the Baltimore Area Evaluated the Total Capital Costs for Four BRT Alternatives, with Route Lengths Ranging from 14.2 to 22.7 Miles, to be Between $800M and $1.1B.
Maryland’s Regional Transit Plan (RTP) focusing on 30 corridors was finalized in September 2020 with the main goal of establishing a plan for improving public transportation in the region over the…
Content type
Made Public Date
12/18/2023
Taxonomy (ARC-IT)
Transit Fixed-Route Operations (PT02)
Geolocation links