Displaying 1 - 10 of 27

A fiber optic communications network supporting traffic operations on a 17 mile section of US-24 in Colorado was estimated to cost $2.5 million.

As part of the Colorado Department of Transportation (CDOT) Smart Mobility Plan, CDOT started construction on a fiber optic backhaul in Colorado Springs to improve real-time access to traffic-…
03/13/2019
Taxonomy: Traffic, Advanced Signal Systems, Traffic, En Route Information

In Denver, the cost for a pilot of self-driving low-speed shuttles was $150,000.

In January 2019, Denver's Regional Transportation District launched a pilot of a low speed autonomous shuttle on public roads. The project's objectives are to: Introduce AV technology safely on…
03/26/2019
Taxonomy: Navigation / Route Guidance

The Colorado Truck Parking Information Management System (TPIMS) has a total estimated capital cost of $9 million.

In Colorado, congestion, topography, and severe weather frequently combine to hinder the efficient movement of national and regional commercial freight traffic. CDOT is proposing to develop the…
03/23/2018
Taxonomy: Traveler Information, Freeway, Dynamic Message Signs

ITS deployment set to improve safety, efficiency, air quality, and traveler information to cost $11,250,000 across Colorado.

In 1998, the Congress designated the I-25 Truck Safety Improvements Project (I-25 TSIP) to support transportation improvements in the State of Colorado. This project was intended to improve…
12/17/2015
Taxonomy: Weight Screening, Automated Inspection, Dynamic Message Signs, In-Terminal / Wayside, Dynamic Message Signs, Advanced Parking

Adaptive signal control can be installed for $20,300 to $82,300 per intersection depending on upgrades required.

This report summarized results of an evaluation of two different commercial real-time adaptive signal control systems installed on two different corridors in Colorado. The InSync system was installed…
06/30/2014
Taxonomy: Adaptive Signal Control

An adaptive signal control system for 11 intersections in Greeley, CO was implemented for $905,500.

The Colorado Department of Transportation (CDOT) implemented two separate adaptive signal control systems, one in Region 2 and another in Region 4. This study was done as a comparison between two…
12/11/2012
Taxonomy: Adaptive Signal Control

An adaptive signal control system for 8 intersections in Woodland Park, CO was implemented for $176,300.

The Colorado Department of Transportation (CDOT) implemented two separate adaptive signal control systems, one in Region 2 and another in Region 4. This study was done as a comparison between two…
12/11/2012
Taxonomy: Adaptive Signal Control

Statewide implementation of Maintenance Decision Support System estimated at $1.5 million.

The costs associated with MDSS use are presented in the table below (in 2008 dollars):   Component Costs ($/year) Assumptions…
05/12/2011
Taxonomy: Mobile Winter Maintenance, Atmospheric Conditions

Between 2003 and 2007, annual operating costs and revenues at 15 tolling agencies averaged $85.825 million and $265.753 million, respectively.

This report covered an analysis of tolling systems to help state officials and other policy makers discuss the implementation and operational costs of alternative revenue-generating systems. Three to…
12/14/2011
Taxonomy: Pricing, Toll Collection, High-Occupancy Vehicle Facilities, High-Occupancy Vehicle Facilities, Pricing

Value pricing projects conducted in three metropolitan areas indicated the costs to convert HOV lanes to HOT lanes ranged from $9 million to $17.9 million.

This research synthesized evaluation findings from 24 projects sponsored by the Federal Highway Administration (FHWA) Congestion and Value Pricing Pilot Program (VPPP) between 1991 and 2006.…
02/02/2010
Taxonomy: Pricing, Toll Collection