Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 4B. I-35W: TH 36 to Blaine.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $12 million to $16.5 million per mile (includes ATM and non-ITS infrastructure). ATM component: $16 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
F9E77228FBAEF67585257981005D791F
Unit
Per Mile
Cost Type
Reported Units
10.8 miles
Capital Cost Per Unit
14250000.00
OM Cost Per Unit
50000.00
Geo