Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 2. I-94: TH 101 to I-494.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $8 million to $10.5 million per mile (includes ATM and non-ITS infrastructure). ATM component: $14 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
E7D078DF15F3102685257981005D74D9
Unit
Per Mile
Cost Type
Reported Units
9 miles
Capital Cost Per Unit
9250000.00
OM Cost Per Unit
50000.00
Geo