Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 5B. I-494: I-394 to I-94.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $8 million per mile (Mn/DOT data includes ATM and non-ITS infrastructure costs). ATM component: $11 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
CD0E11C9F033E67685257981005D7B3C
Unit
Per Mile
Cost Type
Reported Units
8.5 miles
Capital Cost Per Unit
7000000.00
OM Cost Per Unit
50000.00