Unit Cost Component
Description

System integration activities required to connect CMS and CCTV with a TOC. Project duration was 140 working days.

Capital Cost Per Unit
$45,000.00
Adjusted Capital Cost Per Unit
$48,019.50
Reported Units
1
Unit Cost Type
Unit
Lump Sum (LS)
CPI ID
3
CPI Name

PCU511210511210502

Year
2016
Notes
This bid tab data was proposed for a project designed to connect and integrate changeable message signs (CMS) and closed circuit television cameras (CCTV) with a Traffic Operations Center (TOC) to manage traveler information and traffic surveillance on the Route 91 Express Lanes between Orange, Anaheim, and Corona, California. (Bidder 1)