Description
Labor for HOT lanes management
Made Public Date
Match to Unit Cost Element
false
Notes
Labor Costs assume: Operators (2 @ 50% of the time, at $100,000). Maintenance Technicians (2 @ $75,000). Transportation Engineer (1 @ 50% of the time, at $100,000). Salary costs are fully loaded prices including base salary, overtime, overhead, benefits, etc.
Part Of Unit Cost Element Architecture
false
UNID
B4D4CDFA83943F1785257A62007D34C9
Unit
Per Year
Unit Cost Component
Cost Type
OM Cost Per Unit
540000.00
Geo