Description
Transit Center Labor for ICM
Made Public Date
Match to Unit Cost Element
false
Notes
Labor Costs assume: Operators (2 @ 50% of the time, at $100,000). Maintenance Technicians (2 @ $75,000). Salary costs are fully loaded prices including base salary, overtime, overhead, benefits, etc.
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
AB17CBAF2DE2820185257A62007E341C
Unit
Per Year
Unit Cost Component
Cost Type
OM Cost Per Unit
150000.00
Geo