Description

Automated Work Zone Information System (AWIS) acquires traffic data throughout the work zone and display predetermined information to motorists automatically without operator intervention after system initialization. Lump Sum price includes furnishing, installing, operating, and maintaining the AWIS during interchange modification and overcrossing widening project with duration of 750 work days.

Capital Cost Per Unit
$90,000.00
Adjusted Capital Cost Per Unit
$87,174.00
Reported Units
1
Unit Cost Type
Unit
Lump Sum (LS)
CPI ID
2
CPI Name

WPU1178

Year
2016
Notes
Bidder 4