Performance-Based Operations Assessment of Adaptive Control Implementation in Des Moines, Iowa
Background
METHODOLOGY
The report presented methodology for comparing arterial corridors in terms of mobility-based performance measures, with the goal of establishing a process for easily identifying corridors in need of signal re-timing or adaptive signal control.
The evaluation first identified the number of "abnormal" traffic days in a year to characterize the cost-effectiveness of an adaptive system. Then, for "normal" days, it compared volume-normalized performance among corridors to identify problematic segments. This analysis was performed for a total of 13 arterial corridors: 12 around Des Moines, and 1 in Omaha.
Lessons Learned
The study methodology identified three corridors with high numbers of "anomalous" days, and three that performed poorly on "normal" days.
Researchers characterized the analysis used as "extensible," and considered the available performance metrics from the data to be both "flexible and robust" in accurately identifying problematic corridors.
The study suggested that its methods may be expanded to cost-benefit analyses, to identify agency priorities for arterial improvements, or to effectively automate the process of screening locations for signal re-timing.
Though dollar amounts were not given, as the data used had already been purchased by the Iowa DOT the cost savings incurred by not purchasing and installing field infrastructure were indicated to be considerable.
Performance-Based Operations Assessment of Adaptive Control Implementation in Des Moines, Iowa
(Our website has many links to other organizations. While we offer these electronic linkages for your convenience in accessing transportation-related information, please be aware that when you exit our website, the privacy and accessibility policies stated on our website may not be the same as that on other websites.)