Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 6A. TH 169: CR 17 to I-494.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $8 million to $11.5 million per mile (includes ATM and non-ITS infrastructure). ATM component: $14 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
7C731D667138681285257981005D7C4D
Unit
Per Mile
Cost Type
Reported Units
10 miles
Capital Cost Per Unit
9750000.00
OM Cost Per Unit
50000.00
Geo