Description
System testing and documentation to prove functionality and operation for local, subsystem, and final system integration of an ITS network used to connect CMS and CCTV with a TOC. The project duration was 140 working days.
Made Public Date
Match to Unit Cost Element
false
Notes
This bid tab data was proposed for a project designed to connect and integrate changeable message signs (CMS) and closed circuit television cameras (CCTV) with a Traffic Operations Center (TOC) to manage traveler information and traffic surveillance on the Route 91 Express Lanes between Orange, Anaheim, and Corona, California. (Bidder 1)
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
650352144B79880E852582730066FBE4
Unit
Lump Sum (LS)
Cost Type
Reported Units
1
Capital Cost Per Unit
21000.00