Description
Cost estimate to convert a freeway shoulder lane into a MnPASS Lane on Corridor 4A. I-35W: DT Minneapolis to TH 36.
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
Total capital cost: $18 million to $21.5 million per mile (includes ATM and non-ITS infrastructure). ATM component: $8 million per corridor (includes tolling equipment, signs, sign structures, and communications infrastructure).
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
510421B3046E6C9B85257981005D7810
Unit
Per Mile
Cost Type
Reported Units
5.3 miles
Capital Cost Per Unit
19750000.00
OM Cost Per Unit
50000.00
Geo