Description
Automatic time delay shut-off for AVL system. Protects battery against excessive discharge. Chargeguard COTS P/N CG12D. Bulk purchase.
Lifetime
10
Made Public Date
Match to Unit Cost Element
false
Notes
"Construction and Maintenance" is the subsystem category established for projects of this type by SEMCOG in the SE Michigan regional ITS architecture. The Southeast Michigan Snow and Ice Management Project is a multi-agency AVL system in which highway maintenance vehicles are equipped with GPS receivers, and sensors to monitor snow plow use, rates of application for de-icing materials, and ambient air and pavement temperature. Vehicle data is transmitted via 900 Mhz radio to a central server which can be accessed from client work stations located at each partner agency.
Part Of Unit Cost Element Architecture
false
UNID
3F098D88C6B8B5F9852576FE005118F0
Unit
Each (EA)
Cost Type
Capital Cost Per Unit
50.00
Geo