Description
$181 per square foot (ft2) [$181 per 0.0929 square meters (m2)] – The costs presented are based on the ITS Package C equipment deployment, including a 32,000 ft2 [2973 m2] SunGuideSM transportation management center (TMC).
Lifetime
20
Made Public Date
Match to Unit Cost Element
false
Notes
FDOT District 6
Part Of Unit Cost Element Architecture
false
Taxonomy
UNID
3C3970A78F3A6030852576B000603BA5
Unit
Location
Unit Cost Component
Cost Type
Capital Cost Per Unit
5792000.00
OM Cost Per Unit
236430.00
Geo