Content references source material no longer available at its original location.
Unit Cost Component
Description

branching from the backbone. The total installed length is 6.15 miles [9.9 kilometers].

Capital Cost Per Unit
$12,389.00
Adjusted Capital Cost Per Unit
$17,220.71
Unit Cost Type
Unit
Per Mile
CPI ID
10
CPI Name

General

Year
2003
Notes
FDOT District 6