Description
Program management: Includes labor for program management, field system engineer, preliminary design review, critical design review, and related travel.
Made Public Date
Match to Unit Cost Element
false
Notes
"Construction and Maintenance" is the subsystem category established for projects of this type by SEMCOG in the SE Michigan regional ITS architecture. The Southeast Michigan Snow and Ice Management Project is a multi-agency AVL system in which highway maintenance vehicles are equipped with GPS receivers, and sensors to monitor snow plow use, rates of application for de-icing materials, and ambient air and pavement temperature. Vehicle data is transmitted via 900 Mhz radio to a central server which can be accessed from client work stations located at each partner agency.
Part Of Unit Cost Element Architecture
false
UNID
2ABE87CAC008919F852576FC00613997
Unit
Lump Sum (LS)
Cost Type
Capital Cost Per Unit
1524400.00
Geo