Description
Standard Foundation. Purchased and installed.
Made Public Date
Match to Unit Cost Element
false
Notes
This is part of a CDOT engineer's cost estimate. The project includes replacing 13 ITS Weather Stations (RWIS). Towers and sensors will both be replaced, plus the addition of Cellular Modems and Non-Intrusive Sensors. ITS infrastructure to be included with this project includes: bored conduit, trenched conduit, pull boxes, location markers, light standards/foundations, and service meter cabinets.
Part Of Unit Cost Element Architecture
false
UNID
26B4F0C43F516B5D852582B0006E8DAE
Unit
Each (EA)
Unit Cost Component
Cost Type
Reported Units
6
Capital Cost Per Unit
1250.00