The cost to design and develop an Archived Data User Services (ADUS) in Nevada was estimated at $4.225 million.
Made Public Date
11/20/2003

34

Las Vegas
Nevada
United States
Identifier
2003-00038
TwitterLinkedInFacebook

Summary Information

The total cost of the Nevada DOT Freeway and Arterial System of Transportation (FAST) central system software design and development is approximately $4.225 million. The software will provide a fully automated freeway management system, plus the capability to receive, collect, archive, summarize, and distribute data generated by FAST. Of the $4.225 million, the cost to develop the design for the implementation of the Archived Data User Service (ADUS) for FAST was approximately $225,000. This cost included needs assessment, update of functional requirements, update of the regional architecture for the Las Vegas area, and system design.

Cost Estimate for Nevada Archived Data User Service (ADUS)

Cost Estimate for Nevada Archived Data User Service (ADUS)
Publication Sort Date
05/01/2001
Publisher
ITS Joint Program Office, U.S. DOT

(Our website has many links to other organizations. While we offer these electronic linkages for your convenience in accessing transportation-related information, please be aware that when you exit our website, the privacy and accessibility policies stated on our website may not be the same as that on other websites.)

System Cost

Software design and development cost: $4.225 million (2001) ADUS design cost: $225,000 (2001).

Application Areas